About Me

I'm John Huntington, author of Control Systems for Live Entertainment, the first book on show control and entertainment control systems. Through Zircon Designs, I do consulting and design work on entertainment control, show control, and audio systems, but this site contains many non-commercial resources related to entertainment, technology, and anything else I find interesting.

Search The Blog
Contact Me
Blog Feed/Digg/Technorati
This area does not yet contain any content.
Twitter
« Eyebeam Mixer Underground | Main | Robert Lepage La Damnation de Faust at the Met Opera »
Thursday
06Nov2008

Gravesend Inn Haunted Hotel Strike

Day 1:


Gravesend Inn Haunted Hotel Strike Day 1 from John Huntington on Vimeo.

Uh, I thought those curtains were going to be struck earlier in the strike.  So, on Day 2 I moved the camera to a better position:


Gravesend Inn Haunted Hotel Day 2 from John Huntington on Vimeo.

 

PrintView Printer Friendly Version

Reader Comments (5)

Awesome!! That is really cool stuff. It's funny to stop the video at any given moment and see who is standing still. Thanks for the post.

November 7, 2008 | Unregistered CommenterAndrew P.

Wow! That's really fun to watch! Can you play it backwards for load-in? You should definitely do this for an entire show if you can- it would be great to see the whole process from empty stage to complete setup to audience and back to empty again- that would be a great recruitment video.

November 7, 2008 | Unregistered CommenterC Higgins

that is dope professor .. you should do that for trop fest next time

November 9, 2008 | Unregistered Commentercourtley d

Very Cool. How long was it originally?

November 13, 2008 | Unregistered CommenterGreg Scott

Three 3.5 hour calls (I didn't shoot the last day).

November 16, 2008 | Registered CommenterJohn Huntington
Comments for this entry have been disabled. Additional comments may not be added to this entry at this time.